成人免费观看黄页在线,在线观看视频免费国产成人,中文字幕日韩精品一区二区免费,韩国精品无码久久一区二区三区,性xxxx毛茸茸俄罗斯

EN
The FGC project undertaken by Huaxing East for Shunyi Beijing WTE Phase III started construction.
2022.08.11

The flue gas cleaning (FGC) project undertaken by Huaxing for Shunyi WTE Phase III in Beijing was commenced on May 9, 2021.



The plant will build 1x800 t/d grate furnance and 1x18 mw condensing steam turbine with an annual operation of 8000 hours. FGC applies SNCR with urea denitrification in furnace + spray dry reactor with Ca(OH)2 + activated carbon and dry deacidification agent injection system with Ca(OH)2 + bag filter+GGH+SGH + SCR reactor with urea + fly ash conveying, storage and stabilization process. This is an EPC project of Huaxing.



The achievements of Huaxing East in Beijing include Tongzhou Phase II, Shunyi Phase III, etc.